top of page
8-inspecting-screw-piers-ready-for-craning-transportables_edited.jpg

Screw Pier Foundations

Accelerate your next project with our quality, sustainable and reusable screw pier foundation system.

Step 1 - Preliminary Site Investigations

Architects Reviewing Plans

JPL can undertake geotechnical investigations, soil testing, and site surveys to provide a clear understanding of site conditions and recommend the most suitable foundation solution.

Step 2 - Design and Engineering

020.jpg

Once site conditions are established, JPL works with structural engineers to deliver a General Arrangement (GA) design incorporating any required rail systems and tie-downs.

Step 3 - Labour, Materials and Machinery to Install

1bf7a6a3-721a-4932-baf6-0cbab001c4bb.png

JPL have invested in their own Torq-Hub and auger attachments so they are in complete control of the entire process. 

Step 4 - Supply & Install Rail System

046_edited.jpg

Rail systems provide a safer and more efficient solution for large buildings and heavy modules, spreading loads evenly and eliminating the risk of module creep across long building spans.

Step 5 - Load Testing

Torq-Hubs-7inch-Window-OS-LCD-touchscreen-390x390.jpg

JPL generates a detailed installation report directly from its Torque Reporting Hub, providing a time and date stamp for every screw pile installed along with the achieved torque readings. This delivers a complete record of installation performance, giving clients confidence that foundation requirements have been met and fully documented.

Step 6 - Handover and Certificate of Compliance

Construction Handshake Scene

​Upon completion, JPL provides all documentation required within its scope of works, ensuring a complete and compliant project handover with full installation records, certifications, and supporting reports.

© 2023 by JPL Modular. All rights reserved.

  • Facebook
  • Linkedin
bottom of page