

JPL Creative Construction
Modular Building Experts

Screw Pier Foundations
Accelerate your next project with our quality, sustainable and reusable screw pier foundation system.
Step 1 - Preliminary Site Investigations

JPL can undertake geotechnical investigations, soil testing, and site surveys to provide a clear understanding of site conditions and recommend the most suitable foundation solution.
Step 2 - Design and Engineering

Once site conditions are established, JPL works with structural engineers to deliver a General Arrangement (GA) design incorporating any required rail systems and tie-downs.
Step 3 - Labour, Materials and Machinery to Install

JPL have invested in their own Torq-Hub and auger attachments so they are in complete control of the entire process.
Step 4 - Supply & Install Rail System

Rail systems provide a safer and more efficient solution for large buildings and heavy modules, spreading loads evenly and eliminating the risk of module creep across long building spans.
Step 5 - Load Testing

JPL generates a detailed installation report directly from its Torque Reporting Hub, providing a time and date stamp for every screw pile installed along with the achieved torque readings. This delivers a complete record of installation performance, giving clients confidence that foundation requirements have been met and fully documented.
Step 6 - Handover and Certificate of Compliance

​Upon completion, JPL provides all documentation required within its scope of works, ensuring a complete and compliant project handover with full installation records, certifications, and supporting reports.